Texas Instruments TAS5822MEVM Amplifier Evaluation Module (EVM)
Texas Instruments TAS5822MEVM Amplifier Evaluation Module (EVM) showcases the TAS5822M. The TAS5822M is a digital input stereo Class-D closed-loop audio amplifier with enhanced processing and low idle power dissipation. The Texas Instruments TAS5822MEVM is a stand-alone evaluation module. It has a single power supply input, USB control through PurePath Control Console 3 (PPC3), and flexible audio input options.Features
- 96kHz Input Sample Rate Support
- 2.0, Mono, and 2.1 Capable
- Provides flexible input signal routing (USB, Analog, Optical, and external I2S)
- Operates in BTL or PBTL
- Demonstration, Evaluation, and Development environment via the PurePath Console 3 software (GUI)
Required Equipment
- TAS5822MEVM evaluation module
- A USB micro type-B cable
- Power Supply Unit (PSU)
- Desktop or laptop running Windows 7, Windows 8, or Windows 10
- Speakers and cables
- Audio source
- DVD player with an optical or analog cable or Playback Media from Windows 7, Windows 8, or Windows 10
Board Layout
Published: 2021-01-14
| Updated: 2022-03-11
