Gateways

Results: 4,885
Select Image Part # Mfr. Description Datasheet Availability Pricing (GBP) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Product Processor Type Frequency Data Rate Number of Ports Interface Type Supply Voltage - Min Supply Voltage - Max Minimum Operating Temperature Maximum Operating Temperature Dimensions Packaging
Advantech Gateways 1-port Modbus Gateway with Wide Temp.
Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Modbus Gateways 10 Mb/s, 100 Mb/s 2 Ethernet, 1 Serial Serial 12 V 48 V - 40 C + 70 C 37 mm x 140 mm x 95 mm
Phoenix Contact Gateways PSR-M-GW-PN-PI Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

100 Mb/s 2 Port RJ45 24 V 24 V - 10 C + 55 C 22.5 mm x 112.2 x 114.5 mm
Phoenix Contact Gateways FL PN/PN SDIO 2TX/2TX Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
- 25 C + 60 C
Phoenix Contact Gateways EM-CAN-GATEWAY-IFS Non-Stocked Lead-Time 7 Weeks
Min.: 1
Mult.: 1
- 25 C + 50 C
Banner Engineering Gateways DX80 Gateway Board Module 2.4 GHz; 10-30 V dc; External Antenna; For Wireless Q45 Sensors
Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
Banner Engineering Gateways DX80 Perf 2.4 GHz Gateway 65 mW IP67; 10-30 V dc; Ext Antenna; RS-485; Up to 12 Disc PNP IO
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Banner Engineering Gateways DX80 Perf 900 MHZ Gateway IP20 C; 10-30 V dc; Ext Antenna; RS-485; In: 4 Disc 2 Anlg Uni; Out: 4 Disc PNP 2 Anlg 0-20 mA; External Terminals
Lead-Time 2 Weeks
Min.: 1
Mult.: 1
Wireless Industrial Gateways 900 MHz RS-485 10 VDC 30 VDC - 40 C + 80 C
Banner Engineering Gateways DX80 Perf 900 MHZ Gateway IP67; 10-30 V dc; Ext Antenna; RS-485; Up to 12 Disc PNP IO
Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1
Banner Engineering Gateways DX80 Perf 900 MHZ Gateway IP20 C; 10-30 V dc; Ext Antenna; RS-485; Up to 12 Disc PNP IO; External Terminals
Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1
Banner Engineering Gateways PM Series Gateway - LCD Selectable I/O Mapping; 900 MHz IP67, NEMA 6; Inputs: Six Sourcing/PNP Discrete; Outputs: Six Sourcing/PNP Discrete
Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1
900 MHz 10 VDC 30 VDC - 40 C + 85 C
Banner Engineering Gateways PM Series Gateway - LCD Selectable I/O Mapping; 900 MHz IP20, NEMA 1; Inputs: Six Sourcing/PNP Discrete; Outputs: Six Sourcing/PNP Discrete; External Terminals
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
900 MHz 10 VDC 30 VDC - 40 C + 85 C
Banner Engineering Gateways PM Series Node- LCD for Diagnostics; 900 MHz, IP20 /NEMA 1; Inputs:Four Selectable NPN/PNP Discrete, two 0-20 mA; Outputs: Four PNP Discrete, two 0-20 mA; External Terminals
Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1
Wireless Industrial Nodes 900 MHz 2 Port Modbus 10 VDC 30 VDC - 40 C + 85 C
Banner Engineering Gateways Asset Monitoring Gateway; 2.4 GHz ISM Radio; 4G LTE CATM1/NB-IoT Multi-Carrier [Europe Only]; CLOUD ID Auto-detect Wireless Devices; Power Supply & Ethernet Cable Included Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Development Kits - 20 C + 60 C
LUTZE / Amphenol Gateways LOCC-Box-GWIO 7-6455 IO LINK GATEWAY Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
IO-Links 38.4 kb/s 4 Port LIN 10 V 30 V - 25 C + 50 C 116 mm x 107.4 mm x 8.1 mm
HMS Networks Gateways Serial-PROFINET IRT Gateway
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Serial Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 Ethernet, Serial 24 V 24 V 0 C + 55 C 120 mm x 75 mm x 27 mm Bulk
HMS Networks Gateways CANopen Mas-EIP/ModbusTCP Slve
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

USB - 25 C + 55 C 120 mm x 75 mm x 27 mm Bulk
HMS Networks Gateways CAN-PROFIBUS DPV1 Slave GW
Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

CAN Gateways 1 Mb/s 1 x RS232 Serial 24 V 24 V - 25 C + 55 C 120 mm x 75 mm x 27 mm Bulk
HMS Networks Gateways CAN to PROFINET IRT 2-Port
Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

CAN Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 CAN 24 V 24 V - 25 C + 55 C 120 mm x 75 mm x 27 mm Bulk
HMS Networks Gateways PNET IRT Slave 2Port-EIP Master
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

X-Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 Ethernet, USB 24 V 24 V - 25 C + 65 C 114 mm x 44 mm x 127 mm Bulk
HMS Networks Gateways PNET IRT Slave-EtherCAT Slave
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

X-Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 Ethernet, USB 24 V 24 V - 25 C + 65 C 114 mm x 44 mm x 127 mm Bulk
HMS Networks Gateways PNET IRT Slave 2Port-Pbus Slve
Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

X-Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 Ethernet, USB 24 V 24 V - 25 C + 65 C 114 mm x 44 mm x 127 mm Bulk
HMS Networks Gateways DeviceNet Master to Modbus TCP Slave
Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

X-Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 Ethernet, USB 24 V 24 V - 25 C + 65 C 114 mm x 44 mm x 127 mm Bulk
HMS Networks Gateways Modbus TCP/IP Slave to Modbus TCP/IP Slave
Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Modbus Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 Ethernet, USB 24 V 24 V - 25 C + 65 C 114 mm x 44 mm x 127 mm Bulk
HMS Networks Gateways Modbus TCP/IP Slave to INTERBUS Slave
Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

Modbus Gateways 10 Mb/s, 100 Mb/s 2 x RJ45 Ethernet, USB 24 V 24 V - 25 C + 65 C 114 mm x 44 mm x 127 mm Bulk
HMS Networks Gateways PROFINET I/O Slave to PROFIBUS DP-V0 Master
Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

X-Gateways 100 Mb/s 1 x RJ45 Ethernet, USB 24 V 24 V - 25 C + 65 C 114 mm x 44 mm x 127 mm Bulk