0 C Electromechanical

Results: 2,816
Select Image Part # Mfr. Description Datasheet Availability Pricing (GBP) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Banner Engineering Touch Switches STBVP6 Self-Checking Touch Button with IP20 Run Bar and Mini 8-pin QD
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Banner Engineering Touch Switches STBVP6 Self-Checking Touch Button with IP65 Run Bar
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Banner Engineering Touch Switches STBVP6 Self-Checking Touch Button with IP65 Run Bar and E-STOP
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Banner Engineering Touch Switches STBVP6 Self-Checking Touch Button with IP65 Run Bar; and Mini 8-pin QD
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Banner Engineering Touch Switches Run Bar with STBVR81; No E-stop; IP20; STBVR81 Input: 20-30 V ac/dc; STB Output: Complementary Electromechanical delay; No Connectors; customer hardwired
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Banner Engineering Touch Switches Run Bar with STBVR81; E-stop 2 NC contacts; IP20; STBVR81 Input: 20-30 V ac/dc; STB Output: Complementary Electromechanical delay; No Connectors; customer hardwired
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Murrelektronik Circuit Breakers MICO BASIC 8.2 electronic circuit protection, 8 CHANNELS, IN: 24 V DC OUT: 24 V DC / 2 A Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

Murrelektronik Circuit Breakers MICO BASIC 8.6 electronic circuit protection, 8 CHANNELS, IN: 24 V DC OUT: 24 V DC / 6 A Lead-Time 9 Weeks
Min.: 1
Mult.: 1

Murrelektronik Circuit Breakers MICO+ 4.4 electronic circuit protection, 4 CHANNELS, IN: 24 V DC OUT: 24 V / 1-2-3-4 A Lead-Time 5 Weeks
Min.: 1
Mult.: 1

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-0.5A 92 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-10A-E 92 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-12A-E 92 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-2A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-3A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-6A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-8A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-10A-E 92 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-2A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-4A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-8A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-103-DC24V-10A-E 91 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-124-DC24V-12A 90 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-103-DC24V-2A-E 90 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-103-DC24V-4A-E 90 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4

E-T-A Circuit Breakers MoQ=4 Non-Preferred Part (Build to Order) - Alternative Stocked Part Number ESX10-103-DC24V-6A-E 90 Non-Stocked Lead-Time 6 Weeks
Min.: 4
Mult.: 4