All Results (1,308)

Select Image Part # Mfr. Description Datasheet Availability Pricing (GBP) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Semtech Analogue & Digital Crosspoint ICs FcBGA Non-Stocked Lead-Time 38 Weeks
£1,313.60
Min.: 10
Mult.: 10
Semtech Analogue & Digital Crosspoint ICs FcBGA Non-Stocked
£1,209.78
Min.: 10
Mult.: 10
Semtech Analogue & Digital Crosspoint ICs FcBGA Non-Stocked Lead-Time 38 Weeks
£2,077.06
Min.: 10
Mult.: 10
Semtech Analogue & Digital Crosspoint ICs FcBGA Non-Stocked
£1,209.78
Min.: 10
Mult.: 10
Semtech Analogue & Digital Crosspoint ICs FcBGA Non-Stocked Lead-Time 38 Weeks
£2,718.52
Min.: 10
Mult.: 10

Semtech Analogue & Digital Crosspoint ICs 32 QFN (490/tray) Non-Stocked Lead-Time 40 Weeks
£23.62
Min.: 490
Mult.: 490
Semtech Sub-GHz Development Tools IOT Starter Kit 915M w 8ch v1
Product available only to OEM/EMS and design business customers. Product is not shipped to consumers in the EU or the UK. This product will require additional documentation to export from the United States.
Non-Stocked
£927.21
Min.: 1
Mult.: 1
Semtech ESD Protection Diodes / TVS Diodes T MET BI 500W 120V Non-Stocked
£9.36
£8.73
£7.91
Min.: 50
Mult.: 1
Semtech Sub-GHz Development Tools LoRa 915 MHz mbed shield
Product available only to OEM/EMS and design business customers. Product is not shipped to consumers in the EU or the UK. This product will require additional documentation to export from the United States.
Non-Stocked Lead-Time 18 Weeks
£25.74
Min.: 1
Mult.: 1
Semtech Sub-GHz Development Tools LoRa 490 MHz mbed shield Non-Stocked Lead-Time 18 Weeks
£25.74
Min.: 1
Mult.: 1
Semtech Sub-GHz Development Tools LR1110 DVK @490MHz for China/Asia Non-Stocked Lead-Time 20 Weeks
£160.89
Min.: 4
Mult.: 1
Semtech Sub-GHz Development Tools LR1110 @923MHz Ref Design Tracker AU/NZ Non-Stocked
£64.36
Min.: 9
Mult.: 1
Semtech RF Development Tools LR1120 DVK @915MHz for North America
Mouser does not presently sell this product in your region.
Semtech RF Development Tools LR1120 DVK @490MHz for China/Asia Non-Stocked Lead-Time 20 Weeks
£160.89
Min.: 1
Mult.: 1

Semtech Buffers & Line Drivers 22L31 in QFN 4mm x 4mm 24 lead Non-Stocked
£0.549
£0.533
£0.526
Min.: 1,030
Mult.: 10
Semtech ESD Protection Diodes / TVS Diodes PowerClamp, 1-Line, 13.5V, 120A, 30kV Non-Stocked Lead-Time 26 Weeks
Reel
£0.34
Min.: 10,000
Mult.: 10,000
: 10,000
Semtech ESD Protection Diodes / TVS Diodes PClamp 1-Line 23V 100A 30kV Non-Stocked Lead-Time 26 Weeks
Reel
£0.405
Min.: 10,000
Mult.: 10,000
: 10,000
Semtech ESD Protection Diodes / TVS Diodes 1-Line 22V ESD and Surge Protection 120A 30kV TVS ESD MLPD 2x2-3L Non-Stocked Lead-Time 26 Weeks
Reel
£0.311
Min.: 3,000
Mult.: 3,000
: 3,000
Semtech ESD Protection Diodes / TVS Diodes Low Voltage RailClamp 1.0V ESD and EOS Protection Non-Stocked Lead-Time 26 Weeks
Reel
£0.083
Min.: 15,000
Mult.: 15,000
: 15,000
Semtech ESD Protection Diodes / TVS Diodes 1-Line 1.0V 2.5A 0.17pF ESD SLP0603P2X3J Non-Stocked Lead-Time 26 Weeks
Reel
£0.045
Min.: 15,000
Mult.: 15,000
: 15,000
Semtech ESD Protection Diodes / TVS Diodes RClamp, 1-Line 2.8V 0.32pF 8A SLF1006N2P Non-Stocked Lead-Time 26 Weeks
Reel
£0.223
Min.: 10,000
Mult.: 10,000
: 10,000
Semtech ESD Protection Diodes / TVS Diodes RClamp, 3.3V 0.25pF Max. 6A SMF1006N3P Non-Stocked Lead-Time 26 Weeks
Cut Tape
£0.181
Min.: 6,000
Mult.: 3,000
: 3,000
Semtech ESD Protection Diodes / TVS Diodes 1-Line 3.3V, 6A, SLF1006N02PX Non-Stocked Lead-Time 26 Weeks
Reel
£0.285
Min.: 10,000
Mult.: 10,000
: 10,000
Semtech ESD Protection Diodes / TVS Diodes 2-LINE 3.3V 0.25PF 0.2R TVS SLF1610N6 Non-Stocked Lead-Time 26 Weeks
Reel
£0.415
Min.: 3,000
Mult.: 3,000
: 3,000
Semtech ESD Protection Diodes / TVS Diodes RClamp 1-Line 4V 0.65pF 20A SLP0603P2X3 Non-Stocked Lead-Time 26 Weeks
Cut Tape
£0.046
Min.: 30,000
Mult.: 15,000
: 15,000