All Results (666)

Industrial Automation

Electronic Components

Filters

Availability options
Select Image Part # Mfr. Description Datasheet Availability Pricing (GBP) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Advanced Energy / Impac Temperature Sensors - Industrial ISR 6 Advanced, 700 1800 C, laser targeting, RS485 Non-Stocked Lead-Time 4 Weeks
£4,730.04
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IN 6/78-L, 400 1100 C, optics a = 370mm, RS485 Non-Stocked Lead-Time 4 Weeks
£3,356.96
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 140/23, 50 700 C, laser-targeting, focusable optics Non-Stocked Lead-Time 4 Weeks
£3,680.66
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 140/23, 75 900 C, laser-targeting, focusable optics Non-Stocked Lead-Time 4 Weeks
£3,356.96
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 320/23, 75 550 C, a = 250mm, RS485 Non-Stocked Lead-Time 4 Weeks
£1,915.84
£1,790.99
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 320/23, 100...700 C, a = 250mm, RS485 Non-Stocked Lead-Time 4 Weeks
£1,915.84
£1,790.99
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 320/23, 200...1800 C, a = 250mm, RS485 Non-Stocked Lead-Time 4 Weeks
£1,915.84
£1,790.99
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IS 320, 550...1400 C, optics a = 600mm, RS485 Non-Stocked Lead-Time 4 Weeks
£1,419.92
£1,327.38
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 320, 300 1300 C, optics a = 250mm, RS485 Non-Stocked Lead-Time 4 Weeks
£1,493.00
£1,395.70
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 320/23-LO, 150 1200 C, 2.5 m optical fiber (red), RS485 Non-Stocked Lead-Time 4 Weeks
£2,735.82
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial IGA 6 Advanced, 250 1800 C, laser targeting, RS485 Non-Stocked Lead-Time 4 Weeks
£3,847.70
Min.: 1
Mult.: 1
Advanced Energy / Impac Temperature Sensors - Industrial Electrical connection cable Series 500, 510, 520, 530, ISR 50-LO analog, 5m, 4-wire Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Temperature Sensors - Industrial Electrical connection cable Series 500, 510, 520, 530, ISR 50-LO, analog, 2m, 4-wire Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories PI 6000 programmable PID-controller (external), for fixed digital IMPAC pyrometers Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories PI 6000-N programmable PID-controller (external), for pyrometers with analog output Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories IO 8-6, IO-Modul RS485 with 8 Inputs, 6 Relay outputs Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories IA 2, Analog output module with 2 analog outputs (can be used only with IO 8-6) Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Mounting unit Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Adjustable mounting support (Series 5 & 6, cooling jackets Series 300, 310 & 320) Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Adjustable mounting support I Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Adjustable mounting support II for harsh environment Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Mounting angle for sensor Series 500, 510, 520, 530 Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Mounting angle adjustable for sensor Series 500, 510, 520, 530 Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Ball-and-socket-mounting for fiber optical head I and II Non-Stocked Lead-Time 4 Weeks
Advanced Energy / Impac Sensor Fixings & Accessories Adjustable mounting support (3 hole) Non-Stocked Lead-Time 4 Weeks